
Trains under SCR to keep up optimal rate of 130kmph
Hyderabad: The South Central Railway (SCR) has actually boosted the optimum allowable rate of train solutions to 130 kilometres per hr in bulk of the areas of Secunderabad, Vijayawada as well as Guntakal Divisions.
According to SCR authorities, these areas facilities development functions, upkeep jobs as well as signaling facets were executed constantly after due permission was accorded by Research Designs as well as Standards Organisation (RDSO), Lucknow in 2020. After performing considerable upgradation operates in these areas, it has actually currently been allowed to enhance the sectional rate of train solutions from 110 kmph to 130 kmph on both backwards and forwards lines of these areas which will certainly work from September 12.
“The sections that are covered under the speed implementation concept are-Secunderabad-Kazipet-Balharshah, Kazipet-Kondapalli sections in Secunderabad Division, Kondapalli-Vijayawada-Gudur of Vijayawada Division, Renigunta-Guntakal-Wadi of Guntakal Division. These sections cover the entire high-density route, golden quadrilateral and golden diagonal routes of SCR, except for the section between Vijayawada-Duvvada of Golden Diagonal route, where the works are in fast progress for implementation of increased speed,” stated an elderly policeman, SCR.
Arun Kumar Jain, General Manager (In- cost), SCR stated, “The enhancement of maximum permissible speed in these sections is likely to result in the improvement of the average speed of both Passenger-carrying trains as well as Goods trains. This will have a positive impact on the punctuality of the trains and will enhance the sectional capacity of these critical and saturated sections. This concept will also help in reducing the running time of passenger trains considerably and paves the way for the smooth operation of train services.”
.