Greater Hyderabad Municipal Corporation (GHMC) Commissioner R.V. Karnan inspected the proposed 4.3-km, 6-lane bidirectional steel flyover corridor today. The corridor will run from Jubilee Hills Checkpost to NFCL Junction in Hyderabad. Khairatabad Zonal Commissioner B. Santosh and senior engineering officials accompanied him during the visit. The inspection aimed to ensure signal-free traffic movement along the stretch.
The ₹1,090 crore project is designed to improve connectivity and ease traffic congestion in the area. It also aims to provide smoother, signal-free travel across the corridor. During the inspection, the Commissioner reviewed the work plan and issued key directions to officials for faster execution.
He directed officials to speed up junction improvements at KBR Park Main Entrance, Agrasen Junction and Jubilee Hills Checkpost. These works are meant to ensure seamless one-way traffic flow around KBR Park. He also instructed officials to immediately begin geotechnical investigations from Mugdha Junction to NFCL Junction.
The Commissioner asked officials to accelerate foundation excavation and parallel off-site steel fabrication from Jubilee Hills Checkpost to Mugdha Junction. He stressed that the works must be completed on time while minimizing public inconvenience.