Thursday, June 20, 2024
More
    HomeHyderabadWater amount of something available for use to be interrupted on March...

    Water amount of something available for use to be interrupted on March 8

    Related stories

    Jagan predicts YSRCP victory in upcoming elections

    Jagan urged supporters to stay hopeful, resilient, and connected, asking them to remove the feeling of defeat.

    MLA Ganesh from Secunderabad Cantonment inaugurates Karma Shed at Hindu Cemetery

    Cantonment MLA Sri Ganesh recently inaugurated the Karma Shed...

    Hyderabad and Simpliforge Creations install India’s first Pedestrian Bridge using Indigenous 3D Printing Technology

    Hyderabad, 19 June 2024: A 3D printed bridge has beendeployed on the campus of IIT Hyderabad (IITH). The conceptand design were developed and evaluated by Prof. K.V.L.Subramaniam and his research group, Department of CivilEngineering, IIT Hyderabad. The bridge was off-site printed by Simpliforge Creations, a startup company specializing inproviding 3D concrete printing solutions. Designed as apedestrian bridge, a full-scale 7.50 m bridge was field deployedafter load testing a smaller prototype bridge. The...

    Water amount of something available for use to be interrupted on March 8

    - Advertisement -

    Water amount of something available for use to be interrupted on March 8

    Hyderabad: The HO amount of something available for use testament be interrupted in many parts of the metropolis from March 8 to 10 owed to repair works undertaken by Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB) of shifting of existing 3000mm dia MS pumping primary under GDWSS, Phase-I at Kukunoorpally

    - Advertisement -

    A leakage was developed on 3000mm dia GDWSP Phase-I from Murmur to Bommakal for a longtime owed to the non-availability of shutdown owed to urgent situation calling for prompt action for the amount of something available for use of drinking HO to the metropolis of Hyderabad and Mission Bhagiratha off-takes.

    The shutdown is proposed from 6 am on March 8 to 12 am on March 10 which is required only for shifting of 3000mm dia MS pipeline at the railroad crossroad.

    - Advertisement -

    Hence, there testament be no HO amount of something available for use or partial HO amount of something available for use in the areas of Chintal, Alwal, Bollarum, Kompally, Uppal, SR Nagar and Kukatpally. 

    Also read:  Sabitha Indra Reddy and Satyavathi Rathode visit BRS MLC Kavitha at Tihar Jail
    - Advertisement -
    Rajesh M
    Rajesh Mhttps://www.telanganatribune.com
    Latest News from Hyderabad, Telangana, India & World!

    Follow us

    3,565FansLike
    179FollowersFollow
    1,202FollowersFollow
    965SubscribersSubscribe

    Contribute News

    You can contribute an article to Telangana Tribune by dropping a mail at newsdesk@telanganatribune.com

    Latest stories

    LEAVE A REPLY

    Please enter your comment!
    Please enter your name here